New Sea Ray is in excellent condition so not much work to do on it right?
Yeah right...
WORK DONE ON BOAT
Create raised tubing frame between front bow rails so rain water does not pool on boat cover.
Winterised boat by draining all water from engine, adding fuel stabiliser and fogging engine.
Replace trailer strap.
Remove internal cabin cushions, dry out and remove minor mould, and replace.
Clean mould and general stains on all carpet walls and ceiling in forward internal cabin.
Clean and de-stain fibreglass floor, decking under cushions and storage area’s in forward internal cabin.
Remove porta potty, empty, clean and replace.
Wash down entire boat and remove stains and marks.
Clean windscreen and windscreen frames.
Cleaned and de-stained all outside cabin deck carpets and side wall carpets.
Removed outside deck carpet, cleaned fibreglass decking underneath, replaced carpet.
Remove stains on vinyl upholstery.
Clean and protect vinyl upholstery.
Staple loose vinyl upholstery.
Snap button added to under seat storage curtain.
Grease passenger seat for sun-pad extension.
Replace missing boat cover snap button connections on cockpit boat cover.
Cleaned engine bay, battery compartment and power steering/leg tilt compartments.
Installed new adaptors to allow blue drain plugs for winterising engine and improve ease of process.
Cleaned anchor locker and re-organise anchor and rope.
Fibreglass, resin and seal breach/crack to cabin and loose anchor eyelet at bottom of anchor locker.
Remove, clean and replace carpet in anchor locker.
Replaced all (5) blue engine drain plugs in case brittle from age.
Replaced all fuses under dash to ensure all correct ratings and no issues with age.
Replaced inoperative horn unit.
Replaced inoperable stereo unit with Bluetooth version and new speakers.
Reconditioned inoperable windscreen wiper.
Repaired inoperable seat swivel function on captain’s chair.
Replaced 4 x black plastic cup holders with stainless steel cup holders.
Remove bimini top and clean pitted aluminium brace tubes.
Replaced 4 x clips on bimini attachment points.
Adjust depth /fish finder/GPS transducer angle.
STILL TO DO
Repair all gelcoat chips/damage around the boat and hull.
Sand, cut, polish and wax boat and hull.
Polish out drive.
Polish stainless steel prop.
Fill 3 minor tears in upholstery.
Pressure wash/clean both covers.
Purchase and replace damaged gold Sea Ray logo’s on hull sides.
Patch damage/holes on winter boat cover.
Replace missing screws on windscreen.
Re-sew damaged attachment points on winter boat cover.
Touch up hull graphics and polish.
Purchase and install keel protector.
Purchase and install 50mm tow ball.
Purchase and install wheel lock.
Purchase and install new trailer jockey wheel.
Major service on engine and leg.
De-rust and repaint affected areas (including brake drums) on trailer.
Check wheel bearings / grease on trailer.
2012 Metalic Spark Black Kawasaki ZX-14R.
Yoshimura carbon R-77 slip ons,Custom dyno ECU flash,Striker rearsets,Hyperpro RSC steering damper,HM Plus quickshifter,ASV C5 levers,Hel SS transparent red front/rear brake and clutch lines,Kawasaki/MRA vented spoiler screen,Carbon heel guards,R&G radiator guard,Powerbronze carbon rear hugger,ZX-10 front fender with fender extender,Yoshimura frame sliders,M-Factory rear stand stoppers,Escort Redline radar detector,Techspec tank grips and tank protector,Versys 1000 fender eliminator,Kaoko cruise control,Moto red oil cap,Oxford heated grips,Red magnetic oil drain plug,Red and black Bagster Spider rear seat bag (for touring only).